Avoid These Mistakes
1. Late Mall Submission
Mall review takes 5-10 days. Late = everything delayed.
2. Incomplete Drawings
Missing MEP or fire rating info causes rejections.
3. No Value Engineering
Waiting until construction to optimize costs leads to compromises.
4. No Workshop
Contractors who outsource have less quality control.
5. Ignoring Night Shifts
Operational malls restrict to 10 PM-6 AM.
6. Poor Site Survey
Drawing dimensions dont match site. Always survey.
7. Rushed Handover
No documentation = long snag list.