PROJECT MANAGEMENT
THE PRASTARA PROJECT SYSTEM
"Clarity, accountability, and real-time coordination from drawings to handover."
THE INDUSTRY PROBLEM
Most project delays happen because of:
THE PRASTARA WORKFLOW
CLIENT BRIEF
Requirements captured, scope defined, timeline agreed.
DESIGN REVIEW
Drawings reviewed, shop drawing production initiated.
APPROVALS TRACKING
DM, Civil Defence, DEWA, mall submissions tracked.
FABRICATION
Workshop progress monitored across all divisions.
INSTALLATION
Site schedule, daily progress, coordination logged.
QUALITY CHECKS
Inspection checkpoints at every stage.
SNAGGING
Punch list items tracked to closure.
HANDOVER
Documentation, warranty, as-builts delivered.
KEY CAPABILITIES
PROJECT DASHBOARD
Centralised view of drawings, approvals, fabrication progress, site installation, punch lists.
CLIENT UPDATES
Clear milestone updates. Transparent timelines. No chasing.
QUALITY TRACKING
Inspection checkpoints. Material verification. Snag resolution tracking.
DOCUMENT CONTROL
Shop drawings, submittals, approvals, as-builts — all version controlled.
TIMELINE MANAGEMENT
Master programme with milestones. Early warning on delays.
TEAM COORDINATION
Clear ownership. Workshop + site teams aligned to single schedule.